Traffic control plans in Montréal

Most Montréal boroughs require a traffic control plan with your permit request. We prepare the right plan for your site, based on the Québec transport ministry's Tome V standard drawings, and tell you exactly what to set up.

Work-zone traffic control plan on a table next to a hard hat

What's included

  • The right Tome V standard drawing (DN) for your situation
  • Traffic maintenance and detour plans
  • Pedestrian and cyclist corridors
  • Plans sealed by a Québec-licensed engineer (OIQ) when the borough requires it

When do you need it?

  • Public-space occupancy permit requests
  • Lane or street closures
  • Sidewalk or bike-lane closures
  • Work near an intersection

Frequently asked questions

Do I need an engineer-signed plan?

Not always. Many boroughs accept a Tome V standard drawing. For more complex cases they ask for a plan signed and sealed by an engineer. We tell you which one you need.

Got a job coming up?

Describe it in two minutes. We'll get back to you quickly with a quote.